Tell us what you think about our site... Ashton Court - High rise living refurbishment - Warwick District Council
Coronavirus alert

National lockdown rules apply in England. Stay at home.

Coronavirus information

Ashton Court

Tower Block Ashton Court
Ashton Court

We are refurbishing Ashton Court during 2019. Refurbishments include:

  • Assessment and upgrade of all fire sealing to ensure fire resisting compartmentation including all service penetrations
  • Replacement of water stop taps and full fire sealing of stop tap covers
  • Provision of new 60 minute fire resistant flat entrance door sets
  • Provision of new 60 minute fire resistant door sets within communal areas, including cross-corridor doors, electric cupboard doors
  • The installation of automatic smoke ventilation systems to the main stairwell
  • Complete rewire of communal area electrical installations, including new fuse boards within flats
  • Replacement of communal area emergency lighting
  • Installation of new SKY, Virgin and terrestrial TV systems
  • Replacement of all BT cabling
  • The installation of a new concierge enabled door entry system
  • The provision of a new CCTV system
  • New communal area containment to fully secure all wiring within common areas and to future proof future installations
  • Full redecoration of all communal areas to a Class 0 paint specification
  • New communal area flooring
  • New signage throughout, including statutory signage and floor level and flat number directional signage